
Half Hourly
Meters
Sites with a peak load above 100kW should be equipped with half hourly (HH) meters, which record actual consumption every half hour and pass on this information to the energy supplier for more accurate energy billing.
If you have a HH meter, it's mandatory to appoint a Meter Operator (MOP) and Data Collector (DC) for your site. We have suppliers which can provide both of these for you as a complete service.
How this works
A HH Data Collector is responsible for collecting HH consumption data from the meter. This data is then validated and passed on to the supplier for invoicing.
A HH Meter Operator is responsible for installing and maintaining metering and communications equipment, and provides the technical meter details to the Data Collector to enable collection of consumption data.
Finding a cheap gas and electricity supplier in the UK doesn't have to be difficult.
Our free, impartial service saves you time and money.
Let us do the legwork.
Let's talk energy.
Whether you’re a current or future customer, the friendly folks at Forward Utilities are keen to have a conversation. You can call us or email us below and we’ll call you back.
We’re open Monday to Friday from 8.30am to 5.00pm.
"*" indicates required fields